Video Manuals AVIX4
Method
Add tools and parts to task
Adjust quantity of tools and parts used in a task
Breakdown process into tasks & name the tasks
Create a process library
Create task & connect film to the task
Create the process structure in AVIX
Create tools and parts
Decide time estimation method
Decide the time estimation method: MTM-based AVIX, Stopwatch analysis, UAS, SAM, Custom time syst...
Group tasks
Import tools and parts
Resource Balance
Assign Resources
Set balancing rules
set variant expression on parts
The balance chart
work with variants, manually without code
Work with variants, using numeric code
work with variants, using variant code
STEP 1; Import the variant codes, or create the variant codes directly in AVIX. Import variant c...
create a variant mix
Create a weighted average mix, or use production orders to create a mix. Create variant mix, we...
analyze the balance result
Execution optimizer
FMEA
FMEA (AIAG-VDA)
Step 3 - Function analysis
AIAG/VDA methodology is structured and performed in 7 steps
Step 4 - Failure analysis
AIAG/VDA methodology is structured and performed in 7 steps
Step 5 - Risk analysis
AIAG/VDA methodology is structured and performed in 7 steps
Step 6 - Optimization
AIAG/VDA methodology is structured and performed in 7 steps
Step 7 - Reporting
AIAG/VDA methodology is structured and performed in 7 steps
Step1 - Planning and preparation
AIAG/VDA methodology is structured and performed in 7 steps.
Step2 - Structure analysis
AIAG/VDA methodology is structured and performed in 7 steps.