Classifying Stopwatch Times
As previously described, a stopwatch time is generated every time a new task is created (given that a movie is connected). However, this generates gray color (unclassified time) in the method result pie chart.
But, it is still possible to classify the tasks based on the AviX classifications; value adding (◼green), necessary ( ◼yellow), waiting ( ◼orange) and waste ( ◼red), without the need of using operation analysis (i.e. standard time setting).
