Skip to main content

Activities In AVIX

All executed work operations are classed into different activities in AVIX. This enables the
result to be calculated for each activity, that is, to see how the total time for the product is
distributed between different activities. It is also the activities in combination with the
object type that determines which color the action is given.

ActivityDescriptionColor
TakeTaking things◼
PlacePlacing things◼ 
HandleHandling things◼ 
AffixGluing, applying torque, screwing◼ 
AdjustAdjust something◼ 
AssemblePlacing Value part in its final location on product◼
InspectChecking an assembly◼
ReturnReturning things◼
Read instructionGetting information◼
AdministrationDocumentation of information◼
WaitWaiting in workflow◼
WorkMachine work◼



It is the chosen activity for a work operation together with the object type (value object or
fixation object) that determines whether the operation is given the color green, yellow or
red. The green time (productive time) is only given to the combination of assembling a
value object.