AVIX Color System
| Losses | Red time; All long all non-ergonomic movements. |
|
| Waiting | Orange time; Waiting during the production cycle. |
|
| Semi productivity |
Yellow time; Handling of parts and production aids, also affixing and machine time. |
|
| Productivity | Green time; Assembling, this is the time for an optimal assembly. In theory, the single movement required to place a value part in its final position. |